What happens here

Lay down metal or wooden screed rails parallel to each other across the patio area, set to the exact finished height (minus paver thickness). Use an excavator and skid steer to efficiently bring bedding sand to the site. Spread the sand evenly between the screed rails using shovels and rakes. Then, use a long, straight screed board to pull across the rails, creating a perfectly flat and level bedding layer. Carefully remove the screed rails and fill the resulting channels with sand, smoothing them out without disturbing the surrounding bed.

Goal: Install screed rails and spread bedding sand evenly, then screed it to a precise, consistent depth to create a smooth surface for paver placement.

Tools and materials

  • Level Unspecified

What they say

Hide

inch thick. While Sam pulls the board back, Blaine fills in all the indentations behind him. An interesting point : once the sand is leveled, it is no longer tamped or touched in any way. We don't touch it. The boys have run out of sand for the base, and while Blaine has gone to get new material, Sam begins to stack the blocks in preparation for laying. Oh, there's a very steep entrance at the end . The new material arrives just in time. Perfectly. It's sifted sand, and the guys don't care about the cleanliness of the street. They care more about the cleanliness of their sand. They don't want large rocks mixed in with the sand. This is a material for the underlying layer, which means that there should be no impurities . No stones, nothing like that .

Auto-generated from the video audio.