Lay Pavers in Running Bond Pattern
4:05
12:44
78.1K views
At 4:05 in
Start to Finish Rebuild -Done
What happens here
Starting from a fixed and straight edge (e.g., against a house foundation or a predefined border), carefully place the first row of pavers on the screeded sand. For a running bond pattern, stagger the joints of each subsequent row by half the length of the paver. Ensure consistent spacing between pavers (typically 1/8 to 1/4 inch) using spacers if necessary, or by simply pushing them tightly together. Work backward from the installed pavers to avoid disturbing the sand bed.
Goal: Begin laying the concrete pavers on the screeded sand bed, starting from a fixed edge and maintaining a running bond pattern, ensuring tight joints and proper alignment.
Tools and materials
- Paver Spacers (Optional)
- Rubber Mallet
- String Line and Stakes
- Work Gloves