Final Bedding Sand Distribution and Screeding
3:00
12:44
78.1K views
At 3:00 in
Start to Finish Rebuild -Done
What happens here
Using both hand tools and potentially a skid steer for larger quantities, spread any additional bedding sand needed. Repeat the screeding process from Step 4 over any new or disturbed areas to ensure a completely smooth and level surface, ready for paver installation. Maintain the established grade and slope throughout this process.
Goal: Distribute any remaining bedding sand and perform final screeding to ensure the entire patio area has a perfectly flat and ready-to-lay surface.
Tools and materials
- Dump Trailer
- Level (Spirit or Laser)
- Mini Excavator
- Rake
- Screed Board (Long Straight Edge)
- Shovel
- Skid Steer Loader
- Bedding Sand (Concrete Sand)
What they say
(357 characters)Hide
What they say
(357 characters)Auto-generated from the video audio.