Implement Bridging Soil Correction
At 4:50 in
Retaining wall BASE failure
What happens here
Once the extent of unstable soil is determined, begin the bridging soil correction. This involves placing approximately 12-18 inches of structural aggregate, such as 3-inch riprap and then 6-inch of 3/4-inch base rock, into the excavated trench. Crucially, layers of geogrid are incorporated within the rock aggregate to interlock the material and distribute load more effectively, creating a robust, 'cushioned' foundation that prevents the retaining wall from settling into the soft soil. This process builds a stable 'bridge' over the compromised subgrade.
Goal: Execute the bridging soil correction by layering rock aggregate and geogrid to create a stable, reinforced foundation that can support the retaining wall over unstable ground.
Tools and materials
- Plate Compactor
- Shovels
- 3/4-inch Base Rock
- Geogrid
- Riprap (3-inch)
What they say
(1,016 characters)Hide
What they say
(1,016 characters)Auto-generated from the video audio.