Skip to main content

Adjust Wall Placement for Septic Line and Freeze-Thaw

6:38
14:48
15.4K views

At 6:38 in

Retaining wall BASE failure

What happens here

During excavation, an unforeseen septic line is discovered directly in the planned path of the retaining wall. To prevent potential damage to the pipe and ensure the long-term stability of the wall in an area subject to Minnesota's freeze-thaw cycles (which cause significant ground movement), the decision is made to shift the wall's placement. This 'Plan D' involves moving the wall slightly 'north' (away from the septic line and towards an area with less water saturation), reducing the risk of a rigid wall stressing a rigid pipe due to ground fluctuations. The bridging soil correction techniques are adapted to the new wall alignment.

Goal: Discover and reroute the retaining wall's alignment to avoid interference with an existing septic line and to minimize the impact of freeze-thaw cycles.

Tools and materials

  • Measuring Tape
  • Spray Paint/Marking Tools

What they say

Hide

[Music] okay so it's been quite a day here we dug down found some really unstable soils did a little soil correction and it didn't Bridge it up so we had decided to go deeper and wider with our soil Corrections and um upon doing that I found the septic line not too deep under here so that was right where our wall was going to go so what's the chances I want to know what the chances are of us not hitting that with three dudes throwing shovels under there digging it out we didn't hit it remember how you're were saying plan ABC so we're going to move this everything forward so we got lucky here goes from wood siding to the the concrete panels go all the way up even behind this siding so we can still put our wall here so we get to move it forward out of a zone that can cause any damage to anything cuz putting the all that bridging that up the hoping it would not put too much pressure on that pipe would you know is not something you really want to cross your fingers rolling into dice yeah I don't want to roll the dice on cracking that so we're going to move it forward and that is Plan D dude I think we're on like Plan D by now I swear to God we got to be getting close to e all right so let's dive into the mind of Timmy for just a moment here he does not want to build that retaining wall right over the top of that pipe right there he doesn't mind moving that retaining wall North just a little bit and the reason is is right in that

Auto-generated from the video audio.