With the soil corrected and compacted, begin constructing the retaining wall. Lay the first course of retaining wall blocks on the level aggregate base, ensuring they are perfectly aligned and level. Continue building successive courses, interlocking the blocks according to manufacturer specifications. Integrate the construction of the stairs directly into the retaining wall design, creating a seamless transition between levels. Periodically check the level and plumb of the blocks throughout the construction process. The mini-excavator will assist in placing structural backfill behind the walls as they are built.
Goal: Build the multi-tiered retaining wall and integrated stairs by carefully laying blocks on the prepared and compacted aggregate base, ensuring level and plumb installation.
Tools and materials
- Concrete Steps/Slabs
- Levels
- Mini-Excavator
- Power Saw (e.g
- concrete saw)
- Retaining Wall Blocks
- Rubber Mallet
What they say
(2,227 characters)Hide
What they say
(2,227 characters)Auto-generated from the video audio.