Construct Tiered Retaining Wall and Stairs

8:24
14:48
15.4K views

At 8:24 in

Retaining wall BASE failure

What happens here

With the soil corrected and compacted, begin constructing the retaining wall. Lay the first course of retaining wall blocks on the level aggregate base, ensuring they are perfectly aligned and level. Continue building successive courses, interlocking the blocks according to manufacturer specifications. Integrate the construction of the stairs directly into the retaining wall design, creating a seamless transition between levels. Periodically check the level and plumb of the blocks throughout the construction process. The mini-excavator will assist in placing structural backfill behind the walls as they are built.

Goal: Build the multi-tiered retaining wall and integrated stairs by carefully laying blocks on the prepared and compacted aggregate base, ensuring level and plumb installation.

Tools and materials

  • Concrete Steps/Slabs
  • Levels
  • Mini-Excavator
  • Power Saw (e.g
  • concrete saw)
  • Retaining Wall Blocks
  • Rubber Mallet

What they say

Hide

location even though a bridge soil correction would probably work just fine there's the potential for ground movement in Minnesota we go through what's called Freeze thaw Cycles multiple times a year and we get a lot of ground movement think of California but in slow motion instead of an earthquake hitting all at once in Minnesota our ground is constantly freezing thawing freezing thawing in a constant state of fluctuation and there's a lot of water right in that zone so although we could safely build the retaining wall Tim doesn't want to build a bridged retaining wall over a pipe which has to remain rigid because he doesn't want that ground to be moving and grooving underneath that rigid pipe and create a crack so he's just going to move that bridged soil correction north where there's less water less water means less likelihood to have a freeze thaw cycle he's still going to bridge it because he's not comfortable with the soils in that zone but he doesn't want to compromise the Integrity of that pipe that that we discovered underneath that area we can clean it up with the shovel too close is the name of the game we'll clean it the rest of the way up but it's good morning everybody another day another soil correction we hit a whole bunch of slap again video ain't going to do it justice so we were hoping with this being the higher elevation on our second on the second tier of our wall here was going to be drier cuz you know gravity but we did not get that lucky which is no big deal we're just going to go down a little bit deeper and BR it up with a little bit more r getting to about over here no it's got more resistance than over there that part sucks yeah still better than it was we're only getting about that much was like freaking 18 in oh he's getting out of the exavator all right you want to give her you want to give her a little test yeah that is that blood on your hand or is it paint paint harder that probably goes all the way down to the footing honestly it probably goes down under the footing that crappy there this stuff changed color that was where it got good was right right in there that's way better yeah yep oh yeah oh it's just kind of right the the lines are the fundamental