Assess and Prepare for Soil Correction

1:50
14:48
15.4K views

At 1:50 in

Retaining wall BASE failure

What happens here

After initial excavation, use a rebar stake or similar probing tool to test the soil's resistance and depth of instability. In areas where the stake penetrates easily ('like walking on a waterbed'), a soil correction will be necessary. Understand the two main approaches: 'full-fledged soil correction' (removing all compromised soil and replacing it with structural fill) or 'bridging soil correction' (creating a reinforced base using aggregate and geogrid). For this project, a bridging soil correction is chosen to address highly saturated soil conditions caused by poor historical drainage.

Goal: Thoroughly test the excavated soil for stability and identify necessary soil correction methods. This involves probing the ground to determine the extent of loose or saturated soil.

Tools and materials

  • Measuring Tape
  • Rebar Stake

What they say

Hide

[Music] okay first day on the First wall of the Year problems stomp around on that problem we got ourselves on water bad here so sumping up moisture only way to fix it is oversized like we did but uh we're going to have to go a little thicker Rock to bridge this where's one of those staks you can't really see how it's like walking on a water bed we thought 8 in of rock was going to bridge it and it did not all right we ready yeah push we in there yep soil correction time no resistance

Auto-generated from the video audio.