Skip to main content

Final Pool Concrete Demolition and Stacking

5:50
13:24
49.3K views

At 5:50 in

Precision Demolition.

What happens here

The demolition work inside the pool basin continues. The operator uses the ASV RT-75 Posi-Track compact track loader with its Hydraulic Grapple to methodically break down any remaining large sections of concrete from the pool's interior. The focus is on precision, ensuring each piece is adequately fractured and then gathered into neat, organized piles. This strategic stacking of debris helps to optimize the loading process for when the dump truck returns, ensuring maximum efficiency and minimizing downtime.

Goal: Break down remaining pool concrete and prepare it for removal.

Tools and materials

  • Concrete Debris N/A — The remaining broken pieces of concrete from the pool

What they say

Hide

when we go to drop off the concrete if the chunks are too big they can get stuck and hung up in the truck but if they're too small they're just annoying to handle and take longer to deal with so we want to break them down into just the right size pieces and then stack them neatly like flapjacks so when the truck shows up we can load it [Applause] [Music] quicker with no retaining walls in the background to worry about tim doesn't have to be quite as careful when he's handling the side part [Music] so [Music]

Auto-generated from the video audio.