Final Pool Concrete Demolition and Stacking
5:50
13:24
49.3K views
At 5:50 in
Precision Demolition.
What happens here
The demolition work inside the pool basin continues. The operator uses the ASV RT-75 Posi-Track compact track loader with its Hydraulic Grapple to methodically break down any remaining large sections of concrete from the pool's interior. The focus is on precision, ensuring each piece is adequately fractured and then gathered into neat, organized piles. This strategic stacking of debris helps to optimize the loading process for when the dump truck returns, ensuring maximum efficiency and minimizing downtime.
Goal: Break down remaining pool concrete and prepare it for removal.
Tools and materials
- Concrete Debris N/A — The remaining broken pieces of concrete from the pool
What they say
(513 characters)Hide
What they say
(513 characters)Auto-generated from the video audio.