Locker and Upper Cabinet Installation
At 23:20 in
I Built a $5,000 Mudroom for Under $1,700
What happens here
With the base cabinets and bench in place, the pre-painted locker units are lifted and carefully positioned on top of the bench. They are then secured to the wall and to each other using screws, ensuring a stable and aligned vertical structure. Next, the pre-painted upper cabinets are installed above the lockers, following the angled wall profile. These are also secured to the wall and the top of the lockers with screws. The creator double-checks for squareness using a speed square and makes minor adjustments to ensure all components are aligned correctly, emphasizing that small imperfections are acceptable as long as the overall structure is functional.
Goal: Install locker units and angled upper cabinets
Tools and materials
- Cordless Drill Ryobi — Driving screws for installation
- Helper N/A — Assisting with lifting and positioning large units
- Locker Units — Vertical storage components
- Screws — Securing units to the wall and to each other
- Speed Square — Checking and ensuring squareness during installation
- Upper Cabinets — Angled storage components above lockers