Spread and Level Bedding Sand
At 3:49 in
How to Build a Patio 4K
What happens here
Once the screed guides are in place, bedding sand is spread over the compacted aggregate base. A skid steer with a bucket is used to efficiently distribute the sand across the area. Workers then use rakes and a long screed board (a straight edge, often aluminum) to level the sand. The screed board is pulled across the 3/4 inch pipes, removing excess sand and creating a perfectly flat and even surface for the pavers. The goal is to achieve a consistent 3/4 inch layer of sand. After screeding a section, the pipes are carefully removed, and any small voids left by the pipes are filled in and hand-troweled smooth.
Goal: Distribute bedding sand and use a screed board and guide pipes to create a perfectly level and consistent 3/4-inch sand layer for paver placement.
Tools and materials
- Bedding Sand
- Hand Trowel
- Rakes
- Screed Board (e.g
- aluminum)
- Skid Steer with Bucket
What they say
(921 characters)Hide
What they say
(921 characters)Auto-generated from the video audio.