What happens here

Once the screed guides are in place, bedding sand is spread over the compacted aggregate base. A skid steer with a bucket is used to efficiently distribute the sand across the area. Workers then use rakes and a long screed board (a straight edge, often aluminum) to level the sand. The screed board is pulled across the 3/4 inch pipes, removing excess sand and creating a perfectly flat and even surface for the pavers. The goal is to achieve a consistent 3/4 inch layer of sand. After screeding a section, the pipes are carefully removed, and any small voids left by the pipes are filled in and hand-troweled smooth.

Goal: Distribute bedding sand and use a screed board and guide pipes to create a perfectly level and consistent 3/4-inch sand layer for paver placement.

Tools and materials

  • Bedding Sand
  • Hand Trowel
  • Rakes
  • Screed Board (e.g
  • aluminum)
  • Skid Steer with Bucket

What they say

Hide

so by adding too much sand you're setting yourself for failure down the road by getting that sand that 3/4 inch just right everything else will fall in line and I forgot to say that 3/4 inch round pipe sets the exact right height to your sand [Music] the pipes get used as our screed guides they're set just wide enough that we can put a pull a screed board across the top of them without missing a beat but the pipes don't get left in place once we're done screeing off the sand they get removed and the the holes get troweled back [Music] in all right we're either going to have like the perfect amount of sand or be like two bags short think you're going to have just enough I'm I'm hoping for just enough blae and I usually ain't that lucky but maybe you're going to be our good luck charm yeah if that's the case we going to go get if that's the case we're going to go get some scratch offs I like your optimism it's