Initial Ground Preparation and Aggregate Sub-Base Installation

1:50
11:25
14.3K views

At 1:50 in

How to Build a Patio 4K

What happens here

Before any new patio materials are laid, any existing patio or paving must be removed. The underlying raw dirt or soil is then compacted to create a firm and stable foundation, which is crucial for preventing future settling. Following this, a 6-inch deep layer of recycled Class 5 aggregate is spread across the prepared area. This aggregate is composed of a mix of 3/4-inch crushed rock down to very fine particles ('down to minus'), derived from recycled concrete and asphalt. When this recycled aggregate is compacted, it forms an extremely dense and durable sub-base, often described as becoming almost as solid as a piece of new concrete, providing significant structural integrity.

Goal: This initial phase, completed before the video footage begins, involves removing any existing patio structures, thoroughly compacting the raw soil underneath, and then laying a substantial 6-inch layer of recycled Class 5 aggregate.

Tools and materials

  • Skid Steer with Forks
  • Recycled Class 5 Aggregate

What they say

Hide

about right now is you're going to in a moment get to see how we prep the subbase but unfortunately not all of it let me explain the first thing that we did that you missed was we removed moved an existing patio then we had raw dirt underneath that patio and we compacted that raw dirt then we put down 6 in of recycle class 5 what this recycle class 5 is it's 3/4 in rock down to minus and it's recycled material so it's a combination of concrete and asphalt that's been crushed and ground up and when you Rec compact that down it turns almost like another like a a whole solid piece of concrete uh and we put six inches of that down the part where you will see us working now is coming up where we prep the final subbase and what we do there is very critical let's get