Initial Ground Preparation and Aggregate Sub-Base Installation
At 1:50 in
How to Build a Patio 4K
What happens here
Before any new patio materials are laid, any existing patio or paving must be removed. The underlying raw dirt or soil is then compacted to create a firm and stable foundation, which is crucial for preventing future settling. Following this, a 6-inch deep layer of recycled Class 5 aggregate is spread across the prepared area. This aggregate is composed of a mix of 3/4-inch crushed rock down to very fine particles ('down to minus'), derived from recycled concrete and asphalt. When this recycled aggregate is compacted, it forms an extremely dense and durable sub-base, often described as becoming almost as solid as a piece of new concrete, providing significant structural integrity.
Goal: This initial phase, completed before the video footage begins, involves removing any existing patio structures, thoroughly compacting the raw soil underneath, and then laying a substantial 6-inch layer of recycled Class 5 aggregate.
Tools and materials
- Skid Steer with Forks
- Recycled Class 5 Aggregate
What they say
(770 characters)Hide
What they say
(770 characters)Auto-generated from the video audio.