After the main aggregate base is prepared, 3/4 inch round pipes are laid across the area where the patio will be installed. These pipes serve as screed guides, creating a precise and consistent depth for the sand bedding layer that will follow. The narrator highlights that the exact 3/4 inch thickness of the sand layer is critical. Too much sand can cause pavers to deflect under pressure, leading to instability, while the correct amount allows the paver to rest firmly on the hard, compacted base without movement.

Goal: Place 3/4 inch round pipes as screed guides to ensure a consistent depth for the subsequent sand bedding layer.

Tools and materials

  • 3/4 inch Round Pipes

What they say

Hide

[Music] Pond the gray material that's being swept right now is that recycle class 5 that's been compacted those black things that are laying across it are actually just pipes 3/4 in round pipes and that's a critical measurement because that determines the depth of our sand and that that's critical because if you add too much sand what happens is sand has no cohesive binder in it so if you go too deep with the sand you can have a pressure point on the edge of a p and that will sand will give will move it's flexible it's meant to do that when you have just the right amount of sand it'll hit this hard base underneath and it will not allow deflection in the pavers so by adding too much sand you're setting yourself for failure down the road by getting that sand that 3/4 inch just right everything else will fall in

Auto-generated from the video audio.