Fine Leveling and Screeding the Aggregate Sub-Base

3:02
11:25
14.3K views

At 3:02 in

How to Build a Patio 4K

What happens here

Once the 6-inch layer of recycled Class 5 aggregate is laid and initially compacted, the surface is swept clean to remove any loose debris and achieve a finer level. Long, 3/4-inch round pipes are then strategically laid out across the patio area. These pipes serve as critical screed guides, establishing the exact finished height for the sand setting bed. This careful preparation ensures the base is uniform and accurately pitched, preventing unevenness in the final paver surface.

Goal: The compacted recycled aggregate sub-base is meticulously swept and prepared, with 3/4-inch round pipes laid as guides, to create a precisely level surface for the subsequent sand setting bed.

Tools and materials

  • 3/4-inch Round Pipes
  • Broom

What they say

Hide

look at the lake [Music] Pond the gray material that's being swept right now is that recycle class 5 that's been compacted those black things that are laying across it are actually just pipes 3/4 in round pipes and that's a critical measurement because that determines the depth of our sand and that that's critical because if you add too much sand what happens is sand has no cohesive binder in it so if you go