Project Overview and Site Assessment
At 1:06 in
Good Start-Rough Ending- new job
What happens here
The project begins with an on-site assessment of an existing multi-tiered timber retaining wall that has significantly deteriorated over time. The primary objective is to demolish this old structure and replace it with a more durable and aesthetically pleasing boulder retaining wall, incorporating Chilton stone stairs for access between levels. The scope includes removing railroad ties, installing large natural boulders, and creating a sturdy, long-lasting hardscape feature. The worker highlights the poor condition of the existing timber stairs, emphasizing the necessity of replacement.
Goal: The video introduces a significant landscaping project involving the replacement of an old, deteriorating timber retaining wall with a new boulder wall and Chilton stairs. The crew assesses the existing structure and discusses the planned transformation, including the need to remove several layers of old timbers and install new, heavy boulders.
What they say
(1,509 characters)Hide
What they say
(1,509 characters)Auto-generated from the video audio.