Initial Boulder Placement and Foundation Preparation
At 0:52 in
Good Start-Rough Ending- new job
What happens here
After the timber wall is removed and the area is graded, the process of constructing the new boulder retaining wall begins. Large, irregular natural boulders are transported to the site. The excavator, utilizing its grapple attachment, carefully places the initial layer of boulders along the base of the embankment, creating a stable foundation for the wall. Crucially, a layer of geotextile fabric is installed behind these boulders, extending upwards against the house foundation. This fabric serves to allow water to drain through the wall while preventing fine soil particles from washing away and undermining the structural integrity of the house or the wall itself. The process involves precise maneuvering to fit the boulders snugly and ensure a robust base.
Goal: Large natural boulders are positioned along the base of the retaining wall. Geotextile fabric is laid behind the boulders to ensure drainage and prevent soil erosion against the foundation.
Tools and materials
- ATS Attachments SwitchBlade Grapple
- Daewoo Solar 75V Excavator
- Rake
- Shovel
- Geotextile Fabric
- Natural Boulders
What they say
(74 characters)Hide
What they say
(74 characters)Auto-generated from the video audio.