Demolish Old Timber Retaining Wall
At 6:08 in
Good Start-Rough Ending- new job
What happens here
The demolition of the existing timber retaining wall commences with the Daewoo Solar 75V excavator, fitted with a hydraulic grapple, efficiently removing the large railroad tie timbers. For sections positioned close to the house siding, a Milwaukee M18 Fuel Sawzall reciprocating saw is employed for precise cutting, ensuring no damage occurs to the existing structure. The removed timbers are either stacked by the excavator for subsequent handling or directly loaded onto the pallet forks of a Caterpillar 259D skid steer loader. The skid steer then transports these timbers to a large dumpster for off-site disposal. This method is crucial for minimizing the amount of dirt mixed with the timbers, which in turn reduces the significant costs associated with disposing of treated wood like railroad ties. During excavation, miscellaneous debris such as old soda and beer cans are uncovered. Furthermore, large, rusted deadman anchors, which consist of threaded rebar rods attached to metal plates, are also unearthed and removed, highlighting the previous construction methods.
Goal: The old timber retaining wall is systematically dismantled using heavy machinery and specialized tools, with careful attention to debris separation and disposal.
Tools and materials
- Daewoo Solar 75V Excavator Daewoo
- Large Dumpster
- Pallet Forks Attachment
- Shovel
What they say
(2,124 characters)Hide
What they say
(2,124 characters)Auto-generated from the video audio.