Construct Boulder Wall with Modified Basket Weave
At 12:01 in
Good Start-Rough Ending- new job
What happens here
The primary method for constructing the retaining wall is a 'modified basket weave' technique. This involves stacking boulders in an interlocking, brick-like pattern where each upper boulder bridges the joint between two lower boulders, maximizing stability. The operator carefully selects boulders that will marry up perfectly with the existing ones, both below and adjacent, ensuring tight bonds and structural integrity. To add aesthetic appeal and break the monotony of the pattern, 'character stones' (unique or unusually shaped boulders) are intermittently placed. This requires foresight and planning to ensure that subsequent boulders can still integrate seamlessly around these irregular pieces, creating a natural, yet robust, wall. The excavator's precision is critical for these complex placements.
Goal: The boulder wall is built using a 'modified basket weave' technique, stacking boulders in an interlocking pattern, occasionally incorporating unique 'character stones' to add visual interest and break the pattern.
Tools and materials
- ATS Attachments SwitchBlade Grapple
- Daewoo Solar 75V Excavator
- Natural Boulders
What they say
(350 characters)Hide
What they say
(350 characters)Auto-generated from the video audio.