Final Boulder Wall Inspection and Tarping
At 16:44 in
Good Start-Rough Ending- new job
What happens here
The completed section of the boulder retaining wall is shown, highlighting the interlocking boulders and the geotextile fabric providing drainage. The worker then takes preventative measures against an approaching rainstorm. A large blue tarp is carefully spread over the entire exposed work area, covering the newly constructed wall and the excavated sections. This protects the freshly moved soil from erosion and prevents the work site from becoming excessively muddy, allowing construction to resume efficiently once the weather clears. The video ends with the worker acknowledging the rain has indeed arrived, postponing further work.
Goal: The initial section of the boulder retaining wall is completed and inspected. A large tarp is then laid over the entire work area to protect it from impending heavy rain, pausing construction until conditions improve.
Tools and materials
- Large Blue Tarp
What they say
(685 characters)Hide
What they say
(685 characters)Auto-generated from the video audio.