Backfill and Compact Soil
At 13:00 in
Good Start-Rough Ending- new job
What happens here
Once a section of boulders is placed and the geotextile fabric is secured, the crew begins backfilling the area behind the newly installed boulders and fabric. Excavated soil is pushed or shoveled into the void. This soil is then thoroughly compacted using a Wacker Neuson plate compactor. Compaction is performed in layers to prevent settling and ensure the soil provides stable support for the retaining wall. This process is crucial for long-term stability and effective drainage behind the wall, preventing hydrostatic pressure buildup.
Goal: Behind the geotextile fabric and boulders, excavated soil is backfilled and compacted in layers to ensure stability and proper drainage for the finished retaining wall.
Tools and materials
- Daewoo Solar 75V Excavator
- Rake
- Shovel
- Wacker Neuson Plate Compactor
- Excavated Soil
What they say
(80 characters)Hide
What they say
(80 characters)Auto-generated from the video audio.