Install Drainage System and Backfill
At 4:01 in
Finishing the Project & details cutting blocks
What happens here
Once blocks requiring special cuts are ready, proceed with the main wall installation. Ensure a proper drainage system is in place behind the wall. This typically involves laying perforated drainage pipe, covering it with a filter sock, and backfilling with 3/4-inch clear drainage aggregate. This allows water to pass through the wall system efficiently and prevents hydrostatic pressure buildup. The video emphasizes that a previous wall failed due to poor drainage, highlighting the importance of this step.
Goal: After cutting, install necessary drainage components like perforated pipe and drainage aggregate behind the newly placed retaining wall blocks to manage water flow.
Tools and materials
- Mini-Excavator (Bobcat 325)
- Plate Compactor
- Shovel
- Filter Sock
- Perforated Drainage Pipe
What they say
(1,088 characters)Hide
What they say
(1,088 characters)Auto-generated from the video audio.