Final Grading and Aesthetics
At 6:08 in
Finishing the Project & details cutting blocks
What happens here
Once the blocks are installed and drainage is complete, grade the soil behind and in front of the wall to ensure proper water runoff away from the structure. This often involves using heavy machinery like a skid steer loader or mini-excavator to move and spread soil. For aesthetic purposes, decorative materials like white rock (e.g., Fort Dodge White) or topsoil can be brought in and spread, often using machinery and manual raking. This top layer can then be seeded or hydro-seeded for a finished look. The video mentions moving the wall forward by almost two feet to allow for a better grade and drainage. Ensure the area directly in front of the wall has a clear trench (like the one created by a 'Bed Edger') to install edging if desired.
Goal: Complete the retaining wall project by performing final grading behind and in front of the wall, and adding decorative elements or landscaping.
Tools and materials
- Bed Edger Machine
- Mini-Excavator (Bobcat 325)
- Rake
- Skid Steer Loader (CAT)
- Fort Dodge White Rock
- Topsoil
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.