Creating a Smooth Transition Between Tiers
3:05
42:16
214K views
At 3:05 in
Everything You Need To Know Before Building a Retaining Wall
What happens here
After multiple layers of blocks and backfill are installed, the crew reaches a transition point where the second tier begins. The idea is to create a gradual slope connecting the two tiers rather than a harsh vertical drop. The crew uses a compact track loader with a wide bucket to spread soil and create a smooth transition between the upper and lower levels of the retaining wall. This helps to blend the wall more naturally into the surrounding landscape. They also lay down the yellow gas line along the slope, ensuring it's properly positioned for future utility connections.
Goal: Blend the two tiers of the retaining wall with a smooth, natural-looking slope.
Tools and materials
- Caterpillar 259D3 Compact Track Loader — Spreading soil to create the sloped transition
- Shovel — Fine-tuning the slope manually
- Gas Line — Future gas utility connection to the house