Pre-Sod Preparation and Sod Installation
At 11:51 in
Drying up a SWAMP yard- start to finish
What happens here
Due to unexpected rain, the prepared site is covered with large tarps to protect the graded soil from significant erosion and mud buildup. After the rain subsides, the tarps are removed, and the crew assesses the site. Any small holes or disturbed areas, especially footprints from walking on wet soil, are patched with dry soil using hand tools. This ensures a perfectly smooth surface for the sod. Next, pallets of fresh sod arrive and are carefully transported to the backyard using a compact track loader. The sod is then meticulously laid out, piece by piece, across the entire regraded area. Special attention is given to cutting the sod precisely around the base of the boulder retaining wall and along the edges of the side yard, ensuring a clean, finished look and seamless integration with the new landscape.
Goal: After grading, the site is tarped due to rain delays. Once the weather clears, any disturbed areas are patched with dry soil, and then fresh sod is systematically laid across the entire regraded backyard, cut in around the boulder wall and other features.
Tools and materials
- Compact Track Loader (Skid Steer)
- Large Tarps
- Shovels and Rakes
- Sod Cutter/Utility Knife
- Wheelbarrows
- Dry Soil
- Fresh Sod
What they say
(2,501 characters)Hide
What they say
(2,501 characters)Auto-generated from the video audio.