Final Regrading and Deck Area Prep

10:11
18:00
144.3K views

At 10:11 in

Drying up a SWAMP yard- start to finish

What happens here

With the boulder wall established, the final regrading of the entire backyard takes place. The goal is to achieve an aggressive pitch that directs all water flow away from the house, through the backyard, down the side yard, and out to the street. A compact track loader is primarily used for this broad-area grading. The area beneath the deck requires specific attention: existing decorative rock is temporarily moved, soil is added to raise the grade and promote drainage, and then the decorative rock is returned. This prevents water from pooling directly under the deck, which was a previous issue. Hand tools like shovels and rakes are used for fine-tuning the grades, especially in tight or sensitive areas.

Goal: The site undergoes final regrading to ensure proper water flow away from the house and through the backyard, with special attention to preparing the area beneath the deck by adding soil and decorative rock to prevent pooling.

Tools and materials

  • Compact Track Loader (Skid Steer)
  • Measuring Pole
  • Shovels and Rakes
  • Decorative Rock
  • Fine Soil (Backfill)

What they say

Hide

get John here [Music] with the wall in place we can recon s'en trait on the grades and get it prepped for side subgrade has to be cut down enough to allow us to add black dirt back in without altering the course of the flow of water but before we can finish grading we've got to get that area of the wall the deck established and that can't be done with a piece of equipment they need to add soil below the deck to keep the water from pooling so the decorative Rock gets moved to the side soil gets added in and then the rock gets put back in place we've got to get the water to flow from below this deck through the backyard down the side yard and out to the street