Boulder Retaining Wall Construction
At 1:02 in
Drying up a SWAMP yard- start to finish
What happens here
Following the rough grading, the construction of the boulder retaining wall begins. The excavator, equipped with a CMP hydro grapple attachment, is used to lift and precisely position large natural boulders. The operator, Tim, demonstrates the skill required to 'angle in' boulders, making slight adjustments to their orientation and placement to find the perfect fit. This involves leveraging the grapple's ability to rotate and manipulate the stones, ensuring tight interlocks and a structurally sound wall. Smaller boulders are used to fill gaps and create a cohesive, natural aesthetic. The bottom elevation of the wall is determined by the rough grade set in the previous step, establishing the base for subsequent layers.
Goal: Large natural boulders are carefully placed to construct the retaining wall, with the excavator operator making precise adjustments to ensure stability and proper alignment, often angling boulders and fitting them snugly.
Tools and materials
- CMP Hydro Grapple Attachment
- Excavator
- Natural Boulders
What they say
(1,525 characters)Hide
What they say
(1,525 characters)Auto-generated from the video audio.