Skip to main content

Initial Grading and Soil Sorting

0:33
18:00
144.3K views

At 0:33 in

Drying up a SWAMP yard- start to finish

What happens here

The project commences with the main priority being the initial grading of the backyard. A compact track loader (skid steer) is used to remove existing debris and turf, creating a clear work area. An excavator then sorts the excavated soil into two distinct piles. One pile consists of organic topsoil, which will be reused later in the project for planting and sod installation. The second pile contains subsoil, which will either be hauled away or strategically used for backfilling, depending on the grading requirements. This careful sorting is crucial for efficient material management and proper layering.

Goal: The project begins with heavy machinery performing initial grading to clear the backyard and sort the existing soil into two piles: organic topsoil for reuse and subsoil for removal or specific backfilling.

Tools and materials

  • Compact Track Loader (Skid Steer)
  • Excavator
  • Laser Level (Tripod-mounted)
  • Measuring Pole

What they say

Hide

we start the project with the grading this is our main priority Tim sorts the soil into two separate piles one that can get reused and another one that can't all that we've got we've got pooling that goes on right here really bad we're gonna get everything to flow down and around you can see the backyard it's fairly flat we got a nice aggressive pitch going here so we've got to catch this and get it to come to the side and down we get the

Auto-generated from the video audio.