Skip to main content

Initial Concrete Slab Demolition and Stacking

0:00
27:30
26.1K views

At 0:00 in

Demolition Project with Before, During and After Timelapse

What happens here

The ASV RT-75 compact track loader, acting as an excavator, is positioned along the edge of the existing concrete slab surrounding the pool. The operator utilizes hydraulic grapples to grip and exert powerful force, fracturing the concrete slab. Large, heavy sections are then lifted and maneuvered into designated piles, effectively separating them from the main structure. This initial phase focuses on dismantling the accessible perimeter slabs and creating a working space. The grapples are crucial for both breaking and handling the irregularly shaped, heavy concrete pieces.

Goal: Begin the concrete slab removal by using an excavator equipped with hydraulic grapples to aggressively break up and detach sections of the concrete perimeter around the pool. These broken pieces are then strategically stacked into piles on-site for efficient loading and removal later.

Tools and materials

  • ASV RT-75 Compact Track Loader
  • Concrete Slabs
  • Hydraulic Grapples