Break and Stack Remaining Concrete

11:51
27:30
26.1K views

At 11:51 in

Demolition Project with Before, During and After Timelapse

What happens here

The compact track loader, re-equipped with a grapple, efficiently breaks and stacks the remaining large concrete slabs from the pool surround. The operator demonstrates the machine's power by easily breaking thick sections of concrete, even pulling out reinforcing rebar from within the material. The broken pieces are then carefully stacked into neat, consolidated piles, resembling 'flat jacks,' to maximize space and prepare them for final loading onto trucks for hauling away. This methodical approach ensures all concrete debris is managed effectively.

Goal: Break remaining large concrete slabs with the grapple, pulling rebar free, and then stack the pieces efficiently for removal.

Tools and materials

  • ASV RT-75 Compact Track Loader
  • Hydraulic Grapple Attachment

What they say

Hide

[Music] my job but some of you are probably thinking why would he take the time pick that up just to set it down about five feet away from where he picked it up well the idea is from us to break it free from the rebar and stack up his winning pieces like flapjacks as possible that way there Lewis and when the truck shows up you can slide in underneath it and take a whole pile all at once it does take a little bit of time to remove these pieces and separate them and when the truck sit there while time is money I always love the way our kids go on just a movement I didn't expect you to drop like that then a rebar is tying all those pieces of concrete together she's not struggling with the weight of the concrete as much as the rebar that ties it all together the crazy thing that was the ball but it just peels it all that right now really yeah so the Volvo has got more lifting power but we just couldn't get it down into the pool bottle