Skip to main content

Backfill Pool with Initial Dirt Layers

0:32
27:30
26.1K views

At 0:32 in

Demolition Project with Before, During and After Timelapse

What happens here

With the concrete debris temporarily cleared, a dump truck backs up to the edge of the now empty pool basin and begins to unload large quantities of dirt directly into the pool. Simultaneously, the compact track loader moves into the pool, pushing and spreading the newly dumped dirt. This initial backfilling phase aims to quickly fill the significant void left by the removed pool and prepare the area for subsequent compaction and fine grading.

Goal: Dump large volumes of dirt directly into the pool and use the compact track loader to spread and level the initial fill.

Tools and materials

  • ASV RT-75 Compact Track Loader
  • Dump Truck
  • Dirt

What they say

Hide

soil and the director trailing behind by the window the soil and is where we go Six Feet Under

Auto-generated from the video audio.