Skip to main content

Final Grading and Compaction

10:55
27:30
26.1K views

At 10:55 in

Demolition Project with Before, During and After Timelapse

What happens here

With all debris removed and initial backfilling complete, the ASV RT-75 compact track loader meticulously works the soil to achieve the exact desired grade. This includes shaping the terrain to ensure that all water drains efficiently away from any existing structures, such as the house or patio, preventing potential water damage. Compression compaction is performed once more, aiming for ideal moisture content and density, as explained by the operator. For jobs requiring precise gradients, a laser level is utilized to guide the machine, ensuring accuracy. This step is crucial for the long-term stability and success of the new landscape, whether it involves laying sod, planting, or installing patios.

Goal: The final stage of site preparation involves using the excavator to achieve a precise grade and ensure proper compaction of the soil, guaranteeing effective water drainage and preparing the surface for the next landscaping phase.

Tools and materials

  • ASV RT-75 Compact Track Loader
  • Excavator Bucket
  • Laser Level
  • Rakes (Hand Tools)
  • Water Hose

What they say

Hide

over the side so what I'm saying is if we've got an area underneath the size of my hand that we've got to put a structure on we've got to go figure and build up in a pyramid style so that we can then keep the face strong you just can't go straight down I don't know if I'm saying that right [Music]

Auto-generated from the video audio.