Skip to main content

Project Introduction and Site Assessment

0:08
15:05
9.5K views

At 0:08 in

Caught in a Jam! Job site crisis

What happens here

The video begins with an introduction to the project location, a house with a newly paved driveway and concrete stairs. The crew discusses the scope of work, which involves building a retaining wall along both sides of the driveway and stairs. The wall will be about 4 feet tall on one side and extend along the stairs on the other. Initial excavation around the concrete steps is already underway.

Goal: Understand the project's scope and the existing site conditions.

Tools and materials

  • Safety Vest — Increased visibility on site, Shovel Unknown

What they say

Hide

[Music] all right good morning Bruce good morning Z what's the word ah I have no clue what the word is happy Monday yeah so we're building I'm assuming a wall along here and all the way around I'm assuming darn here darn starting here or ing uh on the other side of the step we're starting uh go up the hill about 3/4 of the way up and uh same on the other side we're starting um about even with the staircase straight across yeah that's going to be a lot of Step UPS cuz you're going up and slow and then are we doing anything alongside the stairs here or are we just kind of Dead ending it yes uh we will carry it um up along the staircase um our wall will be about uh 44 up the concrete yeah and uh it will be about the same on the other side along the staircases nice at the same

Auto-generated from the video audio.