Base Preparation and Initial Block Laying
3:43
15:05
9.5K views
At 3:43 in
Caught in a Jam! Job site crisis
What happens here
After excavation, a layer of gravel is laid at the bottom of the trench, providing a stable and well-draining base for the retaining wall. This gravel is then compacted using a plate compactor (Wacker Neuson). The first course of retaining wall blocks is meticulously laid on this compacted gravel base, ensuring they are perfectly level and properly aligned. Special attention is paid to creating clean, angled corners where the wall meets the existing stairs.
Goal: Establish a solid and level foundation for the retaining wall and lay the first course of blocks.
Tools and materials
- Gravel — Creating a stable and draining base for the wall, Hearing Protection Unknown