Skip to main content

Trench Digging and Base Layer Installation

0:49
12:16
8.4K views

At 0:49 in

Can they BUILD the wall in time!

What happens here

The team begins the labor-intensive process of digging a trench along the sidewalk. Using shovels, they carefully excavate the soil, creating a foundational trench for the retaining wall. The removed dirt is piled on the adjacent lawn. After digging, a layer of small gravel or crushed rock is laid into the trench, serving as a compacted base for the initial course of retaining wall blocks. This prepares the ground for the main wall structure.

Goal: Prepare the foundation for the retaining wall by digging a trench and laying a gravel base.

Tools and materials

  • Shovel
  • Small Gravel / Crushed Rock

What they say

Hide

workk I am so proud of the guys you are going to see in today's video you going to see two guys absolutely Step Up and take over every job site has a problem doesn't make a difference what it is the job sites that go well are the ones that you write down on the calendar and you're like can't believe it the job sites that don't go the right way are the ones you just are their status quo we're contractors our job is to handle the problems that we face and the boys today face problems and they absolutely overcome them yeah I'm just going to let the video speak for itself let's just watch the boys work I just want to say I'm really proud of what they accomplish today all right we're done for the day on day one and we got a lot done on day

Auto-generated from the video audio.