Block Placement, Edging Removal, and Grade Adjustment
At 3:08 in
Can they BUILD the wall in time!
What happens here
Continuing on Day 2, the worker meticulously places and levels the first course of retaining wall blocks. He demonstrates how some blocks have an inherent slant, necessitating careful adjustments with a rubber mallet to achieve a level surface. He also inspects the existing metal landscape edging around the house, noting that it is secured with foot-long spikes, making it very difficult to remove. The discussion transitions to the overall yard's grade, which pitches towards the house, creating water drainage problems. The plan is to lower the grade next to the house, level it, and then build it up along the house to ensure water slopes away from the foundation, preventing future issues.
Goal: Accurately lay the first course of blocks, prepare to remove problematic existing edging, and begin planning for the regrading of the yard for optimal drainage.
Tools and materials
- Landscape Edging
- Retaining Wall Blocks
- Rubber Mallet
- Spikes
What they say
(1,415 characters)Hide
What they say
(1,415 characters)Auto-generated from the video audio.