Skip to main content

Backfilling and Continued Wall Construction

8:57
12:16
8.4K views

At 8:57 in

Can they BUILD the wall in time!

What happens here

With the base and returns largely complete, the team focuses on backfilling behind the wall. Zakk, having picked up more rock, begins this process. The main worker continues to build up the wall, using the additional rock for backfill. The goal for the day is to complete the majority of the wall, with final touches scheduled for the following day. The backfilling is a continuous process as the wall is built up, ensuring stability and proper drainage.

Goal: Build up the retaining wall by adding blocks and continuously backfilling to stabilize the structure.

Tools and materials

  • Retaining Wall Blocks
  • Rock
  • Shovels
  • Wheelbarrow

What they say

Hide

who that right there can't see him yet cuz he's so freaking short there he is right there look at that guy woo he has returneth with materials my man I was all freaking was all wound up about this mess of a morning or whatever and I I I like mismeasured lining up off of the stairs so I had to shift everything down 2 in smooth yep yep like dropping a piano Sam I know I know I just I know [Music] good evening everybody if the camera even picks it out oh it's picking it out just barely the sk's popping it's late but we got her done yeah there she is so just got that little bit of back filling yeah we about filling and gring the yard out and doing some other Stu and caps little a little bit of edging and some Mulch good job today though man all right well we'll be back in the morning good early afternoon everyone so

Auto-generated from the video audio.