Skip to main content

Continuing Wall Construction and Backfilling

7:15
12:16
8.4K views

At 7:15 in

Can they BUILD the wall in time!

What happens here

The team continues building the retaining wall, including the return sections that connect to the house. More rock/gravel is brought to the site for backfilling behind the newly laid blocks. This process involves filling the space behind the wall with appropriate material to stabilize it and improve drainage. The blocks are meticulously aligned and leveled to ensure structural integrity and aesthetic appeal.

Goal: This step focuses on extending the retaining wall, constructing return sections, and backfilling with gravel for stability.

Tools and materials

  • Gravel
  • Retaining Wall Blocks
  • Rubber Mallet/Hammer
  • Shovel
  • Spirit Level

What they say

Hide

imagination for a little bit of what we got done this morning it was a mess we needed the Hydra bucket for some grading we were set up to grade right away in this right away in the morning um Zach got down in the yard bright and early to have that Hydra bucket out here by 8 30 or so cuz that was the first thing that we were going to do gets down to the yard and it was still out on another site so he had to drive out on to the like the opposite side of the city's in traffic to grab it and by the time he got down here we we didn't need it anymore I tell you so here's what we got done this morning we did get this grade roughed out and then we got our trench dug for all of our base and stuff like that we got to get some more rocks so sent Zach right back on down to the yard to get some more of that and while he's doing that we're going to get this base in and hopefully well not hopefully we'll have the majority of this W done today and finishing up tomorrow and I feel like I'm really rambling so I'm going to stop talking and we will just get into it all right so first majority of Base done I did have to kick everything down this way a couple of inches after I got uh got down to that end went to go line it up off the side of the step there cuz we want to hug that tight and uh so next step I'm going to get these returns going uh actually be back with more rock here pretty quick then while I'm working on the returns just he going to be building and back filling behind me and then building and back filling and building and back filling and then hopefully we'll be done oh speak of the devil and he shall appear look at that who that right there can't see him yet cuz he's so freaking short there he is right there look at that guy woo he has returneth with