Prepare Foundation and Lay First Course

3:36
11:23
24.5K views

At 3:36 in

Building a new retaining wall and sodding.

What happens here

Accurately measure and mark the intended path of the new retaining wall. For curved sections, establish an 8-foot radius to avoid the need for custom cutting the blocks, ensuring a solid, continuous line of caps. Prepare the foundation by laying a level bed of compacted gravel. This base provides stability and proper drainage for the wall. Carefully place the first course of solid-core interlocking blocks onto the prepared gravel base, ensuring they are perfectly level and properly aligned to form the structural base of the wall. Avoid using hollow blocks as they lack core-filling capability and have an inadequate lip for stability, often leading to premature failure.

Goal: Establish the precise layout for the new wall, including its radius, and then prepare the gravel foundation before carefully laying the first course of interlocking blocks.

Tools and materials

  • Level
  • Shovel
  • Tape Measure
  • Trowel/Hand Tamper
  • Gravel Unspecified

What they say

Hide

put this in for you guys. They're doing a 8ft radius so that I don't have to do any cuts on the radiuses cuz 8 ft you can make just using a which is very very nice. By going with an 8ft radius, we can have a solid line on the cap units, meaning that the backs of the caps won't split or separate. We want to make sure that those caps are uniformly tight, whether that's as straight in a row or going around a radius or a curve. If it gets tighter than that, well, then that means we've got to start to do some custom cutting. So 8 foot is kind of the key measurement to keep us from custom cutting every single cap. What you know about me? What you about? You know about me. [Music] Now the easiest way to break down a bid is in phases. You can we do it but with demolition and excavation as phase one. That's tearing everything apart and prepping for the build. The build itself is phase two. whether that's a retaining wall, a paper patio, uh installing trees, or anything that is the new stuff that's going in place. And then phase three is the restoration. So that is putting everything back together with a nice like it's like buying a Christmas present, putting in a package, wrapping it up, and putting the bow on top of it with your card on the top of it. That's what the restoration does. Puts everything back in order. So, let's break this thing down a little [Music] further. Now, here's where it gets a little bit tricky. On phase one of every job, that's going to be different. You're never going to have the same retaining walls to write rip out, the same slopes to go down, the same amount of dirt to take out. that will always be different. But phase two on a retaining wall build will almost always be the