Install Final Cap Units

8:15
11:23
24.5K views

At 8:15 in

Building a new retaining wall and sodding.

What happens here

Place the top course of cap units onto the final layer of interlocking blocks. Ensure these caps are aligned uniformly and follow the curve of the wall. Adhesive (e.g., landscape block adhesive or concrete adhesive) is typically applied underneath the cap units to permanently secure them in place, preventing shifting or removal. The 8-foot radius should allow these caps to be laid without custom cuts, preserving the clean lines.

Goal: Secure the top layer of cap units onto the finished retaining wall to provide a clean, uniform finish.

Tools and materials

  • Level
  • Retaining Wall Cap Units
  • Landscape Block Adhesive Unspecified

What they say

Hide

template that will help you go out and bid almost every single retaining wall job you do. But there's nuances to that. In this job, you're going to see that we're putting in geog grid. Geogrid means we've got extra excavation, we've got extra back fill, we've got extra compaction. So, we've got to start to take in those small fluctuations into our price. But once we have the generalized guideline on how to bid these things, we can then modify that on a job per job basis. If that doesn't help you out, then I don't know what will. So, give me a thumbs up if it does or a hell yeah in the comments. Hell yeah. Give me a hell yeah.

Auto-generated from the video audio.