Build Wall Layers and Backfill
At 5:58 in
Building a new retaining wall and sodding.
What happens here
Once the first course is set, stack additional layers of interlocking blocks, ensuring each layer is level and properly interlocked with the one below. As the wall height increases, roll out layers of geogrid (geotextile reinforcement fabric) between courses of blocks and extend it back into the excavated area. This geogrid significantly reinforces the wall's structural integrity against soil pressure. Immediately backfill the area behind the wall with at least 200 pounds of gravel per square foot of wall face, ensuring proper drainage and preventing hydrostatic pressure buildup. Use a skid steer to deliver gravel and then manually spread and compact it in layers behind the wall. Sufficient gravel is crucial for the wall's long-term stability.
Goal: Continue stacking subsequent layers of interlocking blocks, ensuring each is level, and incorporate geogrid for reinforcement while backfilling with ample gravel for drainage and stability.
Tools and materials
- Level
- Plate Compactor
- Shovels and Rakes
- Skid Steer (ASV RT-75)
- Geogrid Unspecified
- Gravel Backfill Unspecified
What they say
(2,498 characters)Hide
What they say
(2,498 characters)Auto-generated from the video audio.