Install Initial Base Course with Drainage
4:41
11:23
24.5K views
At 4:41 in
Building a new retaining wall and sodding.
What happens here
Spread a layer of gravel within the excavated trench and compact it thoroughly to create a stable leveling pad. Place the first course of interlocking blocks directly on this compacted gravel, ensuring each block is perfectly level from side to side and front to back, and aligned with the established radius. Install a flexible corrugated drain pipe (e.g., perforated PVC pipe) behind the first course of blocks to manage water runoff and prevent hydrostatic pressure buildup behind the wall.
Goal: Lay the first course of interlocking blocks on a compacted gravel base, ensuring it is perfectly level and includes a drainage pipe.
Tools and materials
- Interlocking Retaining Wall Blocks
- Level
- Plate Compactor
- Rubber Mallet
- Shovel
- Gravel Unspecified
What they say
(1,190 characters)Hide
What they say
(1,190 characters)Auto-generated from the video audio.