Build Subsequent Courses with Reinforcement
At 6:10 in
Building a new retaining wall and sodding.
What happens here
Stack additional courses of interlocking blocks, ensuring each new block overlaps the joint of the blocks below it (staggered). Regularly check for levelness and alignment. For taller or load-bearing walls, install layers of geogrid (geosynthetic soil reinforcement) at specified intervals. Lay the geogrid behind the blocks, extending it back into the excavated slope. Backfill behind each course (or every few courses) with drainage gravel and compact it thoroughly using a plate compactor. This process creates a robust, stable wall structure by distributing pressure and preventing soil movement.
Goal: Continue stacking interlocking blocks for subsequent courses, incorporating geogrid soil reinforcement and backfilling with gravel for stability.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer Loader
- Interlocking Retaining Wall Blocks
- Level
- Plate Compactor
- Rubber Mallet
- Geogrid (Soil Reinforcement) Unspecified
- Gravel Unspecified
What they say
(2,377 characters)Hide
What they say
(2,377 characters)Auto-generated from the video audio.