Skip to main content

Excavate Foundation Trench

3:55
11:23
24.5K views

At 3:55 in

Building a new retaining wall and sodding.

What happens here

Using the Bobcat 331 mini excavator, dig a trench that follows the marked 8-foot radius. The trench should be deep enough to accommodate the base course of blocks plus the gravel leveling pad, ensuring the first course is partially buried for stability. The excavator allows for precise digging along the curved path. Periodically check the depth and levelness of the trench to maintain consistency.

Goal: Dig a level trench for the retaining wall's foundation, ensuring it follows the marked radius and has proper depth for stability.

Tools and materials

  • Bobcat 331 Mini Excavator
  • Level
  • Shovel

What they say

Hide

nice. By going with an 8ft radius, we can have a solid line on the cap units, meaning that the backs of the caps won't split or separate. We want to make sure that those caps are uniformly tight, whether that's as straight in a row or going around a radius or a curve. If it gets tighter than that, well, then that means we've got to start to do some custom cutting. So 8 foot is kind of the key measurement to keep us from custom cutting every single cap. What you know about me? What you about? You know about me. [Music]

Auto-generated from the video audio.