Final Grading and Sod Installation

9:19
11:23
24.5K views

At 9:19 in

Building a new retaining wall and sodding.

What happens here

After the wall is complete, perform final grading of the soil adjacent to the wall, smoothing out any uneven areas created during excavation and backfilling. Prepare the soil bed for sod. Measure the area (length x width) and divide by 9 to get the square yards needed for sod (as sod is typically sold by the square yard). Lay the sod rolls tightly together, ensuring no gaps. Water the newly laid sod thoroughly to encourage root growth and establishment.

Goal: Grade the surrounding soil and install sod to restore the landscape around the newly built retaining wall.

Tools and materials

  • Rake
  • Utility Knife/Blade
  • Sod Rolls Unspecified
  • Water Unspecified

What they say

Hide

[Music] All right. So, phase one was the demo and excavation. Phase two is the build. Now, phase three is the restoration. Now, you can't just leave your customer's yard in a mess all higgled piggly. Well, you can if you tell them ahead of time, but if you haven't done that, then you need to take into consideration the restoration. And that can be seed, it can be sod. In this case, we're doing sod. So, let's break down how we actually do that saw job. What we do is we measure the area and divide by nine. Oh, more math. Oh my god. Yes, you can do it. Simple math. It's length time width and then divide by 9. The key is is you're getting square feet, but you don't buy sod on a price per square foot. Again, you just don't do that. So that divide by 9 converts it to square yards. And that's how you can buy your sod. And that's also how you can charge for your [Music] sod. All right, that's it. We're all wrapped up.

Auto-generated from the video audio.