What happens here

Lay the first course of retaining wall units (blocks, timbers, or boulders) directly onto the compacted gravel base. Ensure each unit is perfectly level from side to side and front to back. Use a rubber mallet to gently tap the units into place if needed. Behind the first course, install a perforated drainage pipe, wrapped in landscape fabric, to direct water away from the wall. This prevents hydrostatic pressure buildup, a common cause of wall failure.

Goal: Establish the foundational layer and critical drainage system.

Tools and materials

  • Landscape Fabric — Wrapping the drainage pipe to prevent clogging and separating soil from gravel backfill
  • Level — Continuously checking the levelness of each wall unit
  • Perforated Drainage Pipe — Collecting and diverting water from behind the wall
  • Retaining Wall Units
  • Rubber Mallet — Tapping wall units into place for precise leveling without damage
  • Shovel — Placing gravel around the drainage pipe
  • Crushed Gravel — Backfilling around the drainage pipe and behind the wall courses

What they say

Hide

development looks like we've got one of the management trucks and then our dump truck let's see let's see what they're doing all right so we got one of our pickup trucks which is the service Fuel and support truck get tools and then one of the dump trucks this is how we get all that rock out to our sits when we demo houses this is what we do something I want to show you see what s sits on the side of my