Install Capstones and Final Grading
8:29
22:51
81.7K views
At 8:29 in
An average Day During the Spring Rush landscaping
What happens here
Once all courses are laid, install the capstones or the final layer of your chosen retaining wall material. These units provide a finished look and protect the top of the wall. Finally, grade the topsoil in front of and behind the wall, sloping it slightly away from the wall's face. This ensures surface water drains away efficiently, preventing erosion and water pooling. Lay sod or spread grass seed for a neat, finished appearance.
Goal: Complete the wall's structure and ensure proper surface drainage.
Tools and materials
- Adhesive — Securing capstones to the top course
- Capstones — Finishing the top of the retaining wall
- Plate Compactor — Compacting graded topsoil
- Rake — Fine-tuning soil grading
- Shovel — Spreading and shaping topsoil
- Grass Seed or Sod — Establishing ground cover for erosion control and aesthetics
- Topsoil — Final grading and establishing vegetation
What they say
(398 characters)Hide
What they say
(398 characters)Auto-generated from the video audio.