Skip to main content

Initial Liner Removal & Wall Preparation

2:05
15:57
73.3K views

At 2:05 in

Alex Crashes in the pool

What happens here

Workers begin by manually pulling sections of the old pool liner out of the pool. Once the liner is partially removed, a worker uses a reciprocating saw to cut into the steel and concrete wall of the pool. This cut creates an initial access point and helps to weaken the structure for subsequent demolition by heavy machinery. This is crucial as the entire pool wall is connected, and a strategic cut prevents a 'domino effect' where the whole wall could collapse unpredictably.

Goal: Prepare the pool walls for heavy demolition by removing liner sections and making initial cuts.

Tools and materials

  • Gloves — Hand protection from sharp edges and debris
  • Hearing Protection — Protecting ears from loud machinery and cutting tools
  • Reciprocating Saw Milwaukee — Cutting through the steel and concrete structure of the pool wall
  • Safety Glasses — Eye protection during cutting and demolition
  • Sturdy Boots — Foot protection in a construction environment
  • Pool Liner — To be removed from the pool

What they say

Hide

i've ever seen [Music] the plan is to have alex take over this pool demo so this will be his very first one tim and i will be stopping in giving him some sense of direction but otherwise leaving him alone to handle this one [Music] tim sends alex to run and grab the beak while he cuts in an access point to get down to that pool liner

Auto-generated from the video audio.