Final Backfilling & Compaction (Phase 2)
14:39
15:57
73.3K views
At 14:39 in
Alex Crashes in the pool
What happens here
The backfilling process continues with additional loads of structural fill soil. The skid steer spreads the soil in thin layers and repeatedly drives over them to achieve thorough compression compaction. This is critical for preventing future settlement of the ground. The video concludes with the pool mostly filled and compacted, ready for the next phase of work, which will involve removing the remaining concrete side walls, as mentioned by the narrator.
Goal: Complete the backfilling and compaction of the pool area to create a stable, level surface.
Tools and materials
- Skid Steer ASV RT-75 Posi-Track — Spreading and compacting structural fill soil
- Structural Fill Soil — Final layers of filling and compacting the pool
What they say