Final Backfilling & Compaction (Phase 2)

14:39
15:57
73.3K views

At 14:39 in

Alex Crashes in the pool

What happens here

The backfilling process continues with additional loads of structural fill soil. The skid steer spreads the soil in thin layers and repeatedly drives over them to achieve thorough compression compaction. This is critical for preventing future settlement of the ground. The video concludes with the pool mostly filled and compacted, ready for the next phase of work, which will involve removing the remaining concrete side walls, as mentioned by the narrator.

Goal: Complete the backfilling and compaction of the pool area to create a stable, level surface.

Tools and materials

  • Skid Steer ASV RT-75 Posi-Track — Spreading and compacting structural fill soil
  • Structural Fill Soil — Final layers of filling and compacting the pool

What they say

Hide

night huh the next video guys we start to get into the heavier demolition we tear out the sidewalls remove the concrete and wrap up this job but the customer does have a few extra requests that they ask of us that's a little bit that's all we're gonna have today god bless go get em you guys and we'll see on another one [Music] he does a pretty good job huh he does okay he's he here's the thing with alex i was thinking about it last night alex is the kind of guy that concentrates on the job right his mind isn't on the party his mind isn't out fishing his mind is actually on the job but his mind is about two steps ahead on the job and so he gets pissed at himself because he's attempting to keep up to where he thinks he should be on the job in his mind and so he's always he always feels like he's one step behind so he's always rushing himself and when you do that you tend to have accidents now we can get him just to relax a little bit yeah and slow down a titch he's gonna be he's gonna be fine dude he's gonna be

Auto-generated from the video audio.