Before & After: Primary Bedroom & Bathroom Access
At 19:48 in
Abandoned House FINAL HOUSE TOUR!
What happens here
The original primary bedroom was shown briefly, appearing to have old carpet and likely dated windows. The renovation included new hardwood flooring, consistent with the rest of the house, and new windows. To address the house having only one bathroom for three bedrooms, a pocket door was installed directly from the primary bedroom into the main bathroom. This allows the primary bedroom occupants convenient private access to the bathroom, creating a semi-ensuite feel without needing to build an entirely new bathroom. This also meant sacrificing existing linen closets that were in the hallway outside the bathroom, but the overall gain in bedroom/bathroom flow was prioritized.
Goal: The primary bedroom was updated with new flooring and windows, and a pocket door was installed to connect directly to the main bathroom, enhancing privacy and functionality.
Tools and materials
- Framing/Drywall
- Hardwood Flooring
- New Windows
- Pocket Door
What they say
(517 characters)Hide
What they say
(517 characters)Auto-generated from the video audio.