Carefully place each concrete block for the first course onto the prepared gravel base. Use a tape measure to ensure consistent spacing, typically allowing a slight overhang (e.g., half an inch) for the 'step-down' effect in a reverse build. Use a spirit level to check each block for levelness, both front-to-back and side-to-side. Tap blocks with a rubber mallet to adjust and firmly seat them into the gravel. This first course is critical as it sets the alignment and stability for the entire wall.

Goal: Position and level the first course of concrete blocks, ensuring they are correctly aligned and firmly seated on the compacted gravel base.

Tools and materials

  • Concrete Retaining Wall Blocks
  • Gloves
  • Rubber Mallet
  • Spirit Level
  • Tape Measure

What they say

Hide

come back a little bit that's fine give us a little room to work okay seven and a half and then you just want to kind of check looks like i could probably come up just a hair but we're close you don't want to go you want to go too much where you're uh going to be fighting it so much you can get them get it as close as you can here so that's a little far now oh it's gonna work this way back now okay so we're close there and you want to be about a half inch in front because you know it's gonna step back steps up right so get an idea there step up or seven and a half and give it a couple taps to see if she's gonna move or not this is some good base material man so that's solid in there