Excavate and Prepare Trench Base
At 8:30 in
A Wall Failure I haven't seen before...
What happens here
After demolition, excavate the trench to the required depth and width according to the retaining wall design. Use a laser level to ensure the trench bottom is consistently level. For areas with wet or compromised soil, consider adding a thicker aggregate base or specific sub-base materials to improve stability. The narrator points out that the old wall failed due to lack of proper aggregate and degraded blocks, emphasizing the importance of this step. Ensure the trench is wide enough to accommodate the block depth plus sufficient space for drainage aggregate and working room.
Goal: Excavate a stable trench for the new retaining wall, ensuring proper depth, width, and levelness, while addressing any issues with wet or unsuitable soil conditions.
Tools and materials
- Excavator
- Laser Level
- Shovel